Description
Gas Installation
To include; Up to measured Metres |
Schedule 40 Pipe Work – Upto measured metres |
2 way gas manifolds; At gas Cage and Cooking Island |
Hammered Flex pipe with fittings at the Island for connection from the manifold to cooker |
Gas Rego |
Gas Shut Valve |